Ua-L&T
2 months ago
Full-time
On-site
Abu Dhabi, United Arab Emirates
- Site Inspections & Risk Management
- Risk Assessments: Conduct detailed Job Safety Analysis (JSA) for tasks like transformer installation, cable pulling, and switchyard gantry erection.
- Permit-to-Work (PTW): Manage and audit the PTW system, ensuring all personnel have proper authorization before entering energized zones.
- LOTO (Lockout/Tagout): Strictly enforce LOTO procedures to ensure equipment is de-energized and safe for maintenance or installation.
- Technical Safety Oversight
- Electrical Safety: Ensure all tools and PPE (Arc-rated clothing, insulated gloves) meet voltage requirements and are properly tested.
- Grounding/Earthing: Verify that temporary grounding is correctly applied during construction to prevent accidental energization.
- Excavation Safety: Substation projects involve heavy trenching for grounding grids; you will oversee shoring and underground utility detection.
- Training & Compliance
- Inductions: Conduct site-specific safety orientations for all contractors and visitors.
- Toolbox Talks: Lead daily briefings focusing on high-risk activities scheduled for the day.
- Incident Investigation: Lead "Root Cause Analysis" (RCA) for any near-misses or accidents and implement corrective actions.
job#onApply" target="_blank" rel="noopener noreferrer" href="https://larsentoubrocareers.peoplestrong.com/login?returnUrl=%2Fjob%2Fdetail%2Flnt_-e-e_1777235&utm_id=13414732&utm_source=HSE+Jobs+in+The+GCC">Apply now
More jobs
PMC Lead Technical Safety HSE Engineer
Wood Group
Head of Department - Technical Safety
Wood Group
- Site Inspections & Risk Management
- Risk Assessments: Conduct detailed Job Safety Analysis (JSA) for tasks like transformer installation, cable pulling, and switchyard gantry erection.
- Permit-to-Work (PTW): Manage and audit the PTW system, ensuring all personnel have proper authorization before entering energized zones.
- LOTO (Lockout/Tagout): Strictly enforce LOTO procedures to ensure equipment is de-energized and safe for maintenance or installation.
- Technical Safety Oversight
- Electrical Safety: Ensure all tools and PPE (Arc-rated clothing, insulated gloves) meet voltage requirements and are properly tested.
- Grounding/Earthing: Verify that temporary grounding is correctly applied during construction to prevent accidental energization.
- Excavation Safety: Substation projects involve heavy trenching for grounding grids; you will oversee shoring and underground utility detection.
- Training & Compliance
- Inductions: Conduct site-specific safety orientations for all contractors and visitors.
- Toolbox Talks: Lead daily briefings focusing on high-risk activities scheduled for the day.
- Incident Investigation: Lead "Root Cause Analysis" (RCA) for any near-misses or accidents and implement corrective actions.